My GivEnergy solar and battery system is failing intermittently, GivEnergy is in administration and so is my installer, so it was a relief to get Ron’s expert advice.
Inverter Replacement in Nottingham
- Nottingham and wider East Midlands covered
- Same pricing as our core Yorkshire area
- DNO G98/G99 paperwork included
Tell us the inverter brand and model — or send a photo of the unit. Include the fault symptoms and your Nottingham postcode. We'll confirm the replacement spec and give you a written quote.
Book replacementDiagnose first — free if we can't fixRon was extremely helpful and tried his best to repair/reset our GivEnergy inverter remotely. In the event he was unsuccessful but he couldn’t have been more helpful. If you have problems with a GivEnergy system please contact him. Highly recommended
Sts does a extremely great job. Thank you.
Superb work from Ronald. Cannot recommend highly enough. Figured out my problem late into night, going above and beyond! Many thanks to him
Absolutely wonderful. Would recommend without hesitation. I had an issue I was thinking would never be fixed and they fixed it. Help, advice and support every step of the way. I can't recommend highly enough. Thank you so much ⭐
The Solar Tech Support company was the only one to respond to a request for someone to supply and fit a new inverter for our solar panels after our old one finally expired after 26 years. Ron kept us well informed throughout, came and ascertained that the issue was down to the inverter having failed then sourced and fitted a new one. He got the system up and running again, set up the wi-fi performance feedback and took away the old inverter for disposal. By acting promptly and fitting the job around existing commitments we were able to get our solar power unit back in operation with minimal delay in the short while before we were due to go away for a week. The work was carried out very professionally and we were asked to confirm that all was in order the following day. I was impressed that, having recently taken on additional work for GivEnergy customers we were able to keep our solar panel down-time to a minimum. I would highly recommend for prompt attention and first-rate service.
Why Nottingham is hitting the inverter replacement window now
Nottingham City Council ran one of the largest residential solar programmes in the East Midlands during the FiT era. Thousands of systems were installed across council estates and private homes between 2010 and 2015, many through national installers who have since ceased trading. The inverters on those systems — predominantly Fronius Galvo, Solis Mini, and Growatt ShineWay units — are now 10–15 years old. That's exactly the lifespan window where string inverters start to fail, and Nottingham is seeing a wave of replacements as a result.
Age of most Nottingham FiT-era systems — entering the failure window
Typical scheduling for Nottingham replacements once quoted
High rental density — we handle tenant coordination and handover
The rental market adds a layer of complexity in Nottingham. Many buy-to-let properties near the universities in Beeston, Lenton, and Dunkirk have inherited solar systems where the landlord doesn't know the original installer, has no monitoring access, and isn't sure whether the inverter fault is covered by warranty. We handle the full recovery alongside the physical replacement — manufacturer warranty check, monitoring transfer (GivEnergy: the current owner transfers it in the app), and documented handover for the landlord's records.
Inverters we replace most often in Nottingham
Nottingham's inverter mix is less diverse than some cities — the council scheme era means certain brands dominate specific neighbourhoods. Each has a different failure pattern and replacement path.
Galvo and Primo models from 2011–2014 installs. Very common across West Bridgford, Mapperley, and Sherwood on private installations. The Galvo series is now well past its expected lifespan. Typically replaced with a current hybrid unit if the homeowner wants to add battery storage to their existing FiT system.
Mini and 4G models from council scheme rollouts across Bulwell, Bestwood, Arnold, and Carlton. High volume of identical units on similar roof configurations makes these very predictable to replace. The Mini series typically fails at the relay or DC isolation after 8–10 years — a consistent pattern we see across all our coverage areas.
ShineWay and MIN models from 2015–2018 installs reaching end of life in Beeston, Stapleford, and Hucknall. Growatt systems in Nottingham were often installed by smaller regional firms that have since closed. A diagnostic confirms whether the fault is a full inverter failure or a fixable communications issue.
GivEnergy on newer battery retrofits — faults here are often firmware or communication issues rather than hardware failure. SolarEdge on premium installs in West Bridgford and The Park. SMA Sunny Boy on older high-end systems across the western suburbs.
We also replace Enphase, Sunsynk, Huawei, Fox ESS, SolaX, and all other major UK brands. Full inverter replacement service details →
Inverter replacement pricing in Nottingham
Single-phase, 2–6 kW. Same-spec or updated equivalent. The bread-and-butter replacement for Nottingham's council programme Fronius Galvo and Solis Mini fleet.
Swap your failed string unit for a hybrid that manages both solar and battery. Makes particular sense for Nottingham landlords looking to future-proof rental properties with storage.
8 kW+ and three-phase units. Assessed individually. Full pricing details →
All prices include supply, decommission, installation, commissioning, DNO G98/G99 paperwork, and post-installation report. Same pricing as our core Yorkshire area — no additional charge for Nottingham.
Bought a Nottingham property with solar — and now the inverter has failed
Nottingham's large rental and buy-to-let market means many property owners have inherited solar systems they know very little about. The original installer may have gone bust, monitoring access may be lost, and the FiT registration may not have been transferred properly. When the inverter fails, landlords often don't know where to start. We handle the full recovery alongside the physical inverter replacement.
Solarplicity, Mark Group, All Seasons Energy, Snug Energy — full recovery guides for every major installer that has ceased trading.
See all guides →Full system assessment if you've inherited a solar system and want to know its condition before deciding on repairs or upgrades.
Health check details → Book inverter replacementAreas we cover for inverter replacement in Nottingham
We cover all of Nottingham and the wider conurbation. Nottingham is extended coverage from our Yorkshire base — about 90 minutes — so lead times are slightly longer than our core area, but pricing is identical and we schedule most replacements within the same week.
We also cover nearby Mansfield, Derby, and the wider East Midlands. Full coverage map → · All solar services in Nottingham →
Inverter replacement in Nottingham — common questions
Inverter failed in Nottingham? Get a replacement quote.
Drop us the inverter brand, model, and what it's doing wrong — or photograph the data label and send it through. We'll match the replacement to your array, confirm pricing in writing, and schedule the swap. Nottingham gets the same rates as our Yorkshire heartland with no mileage add-on.
- String inverter from £995 · hybrid from £1,495
- DNO G98/G99 paperwork and post-installation report included
- Not sure it's the inverter? Free remote diagnostic
We’re busier than ever. Thank you for your patience.
Due to unprecedented demand we’re currently only carrying out on-site work in Yorkshire, and replies are taking up to 7 days. Remote diagnostics continue for the whole UK as normal.
Every message is read and answered, so please don’t send it twice; that only slows the queue.
We use cookies to measure traffic and ads, sharing limited hashed data with Meta and Google. Decline keeps only essential cookies. Privacy policy
Got a solar fault or need a quick answer? Drop us a message and we usually reply within a few minutes. Mon–Fri, 9am–7pm.